基于工程实践的长城三矿回风巷道支护参数优化研究

王开华 潘云飞 罗鹏

陕西煤炭2025,Vol.44Issue(5):37-41,5.
陕西煤炭2025,Vol.44Issue(5):37-41,5.DOI:10.20120/j.cnki.issn.1671-749x.2025.0507

基于工程实践的长城三矿回风巷道支护参数优化研究

Support parameter optimization of return air roadway of Changcheng No.3 Mine based on engineering practice

王开华 1潘云飞 1罗鹏1

作者信息

  • 1. 山东能源新矿集团长城三矿,内蒙古鄂尔多斯 016200
  • 折叠

摘要

Abstract

In order to solve the problem of large deformation and difficult control during the operation of the 5 coal return airway in Changcheng No.3 Mine,the reasons for the large deformation of the surrounding rock in the roadway were identi-fied through drilling observation,expert verification,and theoretical calculation,and measures such as support optimization and grouting were proposed to improve the situation.The results showed that the anchor rod with a length of 2 000 mm was replaced with a 4 000 mm anchor cable,and the length of the 5 400 mm anchor cable increased to 7 000 mm.The vertical displacement of the roadway has decreased by 78%,the horizontal displacement has decreased by 71%,and the plastic zone damage area of the roadway roof has decreased.On site industrial experiments have shown that after 100 days,the roadway tends to a stable state.The maximum displacement of the roadway roof is 90 mm,and the maximum displacement of the two sides is 73 mm.The deformation of the surrounding rock of the roadway is relatively small,which meets the safety production conditions.

关键词

支护优化/注浆加固/围岩控制/巷道顶板

Key words

support optimization/grouting reinforcement/surrounding rock control/roadway roof