铁道标准设计2025,Vol.69Issue(4):175-180,189,7.DOI:10.13238/j.issn.1004-2954.202307030008
高速铁路ATO系统功能优化研究
Research on Function Optimization of High-speed Railway ATO System
摘要
Abstract
The Beijing-Zhangjiakou High-speed Railway is the first high-speed railway in China that adopts CTCS-3+ATO technology.After the 2022 Beijing Winter Olympics,operating departments identified several issues with the ATO system,such as ineffective intervention during vehicle slippage,insignificant energy savings at intermediate stations,and frequent traction-braking switching with delays when entering Chongli Station.To address these issues,improvements were made by incorporating skilled train drivers' experience.During coasting,the system avoided increasing braking levels to prevent exacerbating slippage caused by high-level braking.After coasting,the ATO system adopted an early braking deceleration strategy to mitigate the effects of train coasting.For intermediate stations,the energy-saving control curves were calculated based on the scheduled arrival time of the final station in the operation plan,combined with additional track data transmitted from the ground.When entering a station,the train operated at a planned speed of 60 km/h,and upon receiving a siding entry signal,the train speed was controlled according to the actual speed limit of the turnout.Finally,an integrated ATO system test platform was established in the laboratory for thorough testing and verification of the optimization scheme.The test results showed that after detecting vehicle slippage,the optimized ATO applied low-level braking to decelerate the train,reducing slippage caused by high-level braking and aligning more closely with skilled train drivers' experience.The optimized ATO enhanced station passage efficiency and overall system energy savings.Furthermore,when entering Chongli Station,there was no frequent switching between traction and braking,and the actual arrival time was 6 seconds earlier compared to the scheduled arrival time in the operation plan.The proposed optimization scheme is reasonable,feasible,and meets the operational requirements of the Beijing-Zhangjiakou High-speed Railway system.关键词
高速铁路/CTCS3+ATO系统/打滑/通过车站/控车策略/功能优化/测试验证Key words
high-speed railway/CTCS3+ATO system/slippage/intermediate station/train control strategy/function optimization/testing and verification分类
交通工程引用本文复制引用
王一阁,易海旺,周博渊,惠子南..高速铁路ATO系统功能优化研究[J].铁道标准设计,2025,69(4):175-180,189,7.基金项目
中国国家铁路集团有限公司科技研究开发计划系统性重大项目(P2021G053) (P2021G053)
中国铁道科学研究院集团有限公司科研项目重大课题(2022YJ271) (2022YJ271)
北京华铁信息技术有限公司科研项目(2022HT04) (2022HT04)