| 注册
首页|期刊导航|铀矿冶|地浸采铀"水平井注-直井抽"与"直井抽注"数值模拟对比

地浸采铀"水平井注-直井抽"与"直井抽注"数值模拟对比

李星浩 李召坤 张宇 赵龙昊 李沁慈

铀矿冶2025,Vol.44Issue(2):18-28,11.
铀矿冶2025,Vol.44Issue(2):18-28,11.DOI:10.13426/j.cnki.yky.2024.07.02

地浸采铀"水平井注-直井抽"与"直井抽注"数值模拟对比

Numerical Simulation Comparison on"Horizontal Well Injection-Vertical Well Pumping"and"Vertical Well Injection and Pumping"in In-situ Leaching of Uranium

李星浩 1李召坤 1张宇 1赵龙昊 1李沁慈1

作者信息

  • 1. 核工业北京化工冶金研究院,北京 101149
  • 折叠

摘要

Abstract

In order to clarify the leaching effect of horizontal well technology on in-situ leaching of ura-nium,a numerical simulation method was used to study the influence of different parameters on"Hor-izontal Well Injection-Vertical Well Pumping"and conventional"Vertical Well Injection and Pum-ping".The results show that compared with"Vertical Well Injection and Pumping",the length of horizontal wells is proportional to the leaching range,the vertical leaching range of"Horizontal Well Injection-Vertical Well Pumping"is small,the plane sweep efficiency is high,the dead corner of leac-hing is small,and the effective utilization rate of leaching solution is high;it has a wide coverage in the horizontal direction and have significant advantages in the treatment of thin uranium ore deposits.The ratio of horizontal permeability to vertical permeability has a greater impact on the leaching of"Vertical Well Injection and Pumping".When the vertical permeability is low,the leaching effect of horizontal well sections is better than that of vertical well sections;the amount of pumping and injec-tion fluid is positively correlated with the leaching range.As the amount of pumping and injection flu-id increases,the dead corners of leaching of both"Horizontal Well Injection-Vertical Well Pumping"and"Vertical Well Injection and Pumping"decrease.The increase in the amount of pumping and in-jection fluid has a greater impact on the leaching effect of"Horizontal Well Injection-Vertical Well Pumping".When the flow rate reaches 210 m3/d,the leaching range of the ore layer of"Horizontal Well Injection-Vertical Well Pumping"is higher than that of generalized"Vertical Well Injection and Pumping".

关键词

地浸采铀/水平井/直井/数值模拟/渗透率/抽注液量/溶浸范围

Key words

in-situ leaching of uranium/horizontal well/vertical well/numerical simulation/permeability/pumping and injection fluid volume/leaching range

分类

能源科技

引用本文复制引用

李星浩,李召坤,张宇,赵龙昊,李沁慈..地浸采铀"水平井注-直井抽"与"直井抽注"数值模拟对比[J].铀矿冶,2025,44(2):18-28,11.

基金项目

中核集团集中研发项目(中核科发[2021]144号,深部砂岩铀矿水平井钻成井与流场调控技术研究). (中核科发[2021]144号,深部砂岩铀矿水平井钻成井与流场调控技术研究)

铀矿冶

1000-8063

访问量1
|
下载量0
段落导航相关论文