铀矿冶2025,Vol.44Issue(2):133-141,9.DOI:10.13426/j.cnki.yky.2024.09.06
德兴铜矿地测业务功能优化开发与应用研究
Optimization Development and Application Research of Geodetic Surveying Functions at Dexing Copper Mine
摘要
Abstract
Dexing Copper Mine integrates the organization and management of the mining production process with modern mining technologies.Through the DIMINE 3D mining software,digital model-ing and updates of the resources in certain mining areas have been completed.However,issues such as data silos in the existing CAD-based geological and surveying system,data integration challenges,and the absence of a database version in the early stages of the DIMINE software continue to constrain the mine's progress toward intelligent mining.To promote smart mining,enhance the efficiency and economic viability of mining processes,and address fundamental aspects of geology,surveying,and mining in intelligent mining construction,the functionalities of the original system were analyzed,re-searched and optimized.A customized development was carried out based on the DIMINE software system to achieve full coverage of the existing geological and surveying platform's functions and data at Dexing Copper Mine,ensuring the preservation of historical data and meeting the operational require-ments of geological and surveying tasks.关键词
智能矿山/德兴铜矿/DIMINE三维矿业软件/定制开发/优化开发/地测业务Key words
intelligent mine/Dexing Copper Mine/DIMINE 3D mining software/custom develop-ment/optimized development/geological and surveying services分类
矿业与冶金引用本文复制引用
李兵,范欣,俞黎斌..德兴铜矿地测业务功能优化开发与应用研究[J].铀矿冶,2025,44(2):133-141,9.基金项目
国家重点研发计划(2023YFC3904205). (2023YFC3904205)