| 注册
首页|期刊导航|河南水利与南水北调|城市河道防洪不足及综合治理对策

城市河道防洪不足及综合治理对策

邵冰

河南水利与南水北调2025,Vol.54Issue(4):6-8,3.
河南水利与南水北调2025,Vol.54Issue(4):6-8,3.

城市河道防洪不足及综合治理对策

The Insufficient Flood Control Capacity of Urban Rivers and Comprehensive Improvement Measures

邵冰1

作者信息

  • 1. 本溪市水务事务服务中心,辽宁 本溪 117000
  • 折叠

摘要

Abstract

The implementation of comprehensive river regulation projects has important practical significance for ensuring the stability of river regime,enhancing the flood control capacity along the banks,and protecting the ecological environment of river reaches.Taking the Beisha River Basin in Benxi City as the research object,four different river sections were subdivided to summarize the current situation and existing problems in river flood control,analyze the necessity of comprehensive management,and propose project management measures such as consolidating and upgrading the existing engineering works,building new revetments,and clearing the obstructions in the river channel.The study area is divided into two engineering sections from the downstream to upstream with the Xigaopu Bridge as the boundary,namely,the consolidation and improvement section of the existing engineering and the new revetment section.The new revetment section is located from the Xigaopu Bridge to the Sanlv Elderly Apartment,and the main revetment is built with gabion for foot protection and green geotextile mattresses for slope protection.The practical evidence shows that the regulation strategy has effectively enhanced the flood control capacity of the river section in the study area,improved the flood control system of the river section,and ensured the safety of the surrounding areas.The research results can provide reference for the comprehensive prevention and control of urban river floods.

关键词

治理对策/防洪/城市河道/北沙河

Key words

regulation measures/flood control/urban river/geisha River

分类

水利科学

引用本文复制引用

邵冰..城市河道防洪不足及综合治理对策[J].河南水利与南水北调,2025,54(4):6-8,3.

河南水利与南水北调

1673-8853

访问量0
|
下载量0
段落导航相关论文