深圳河流域"2023.9.7"极端特大暴雨下水工程联合调度探讨

梁彬锐 吴辉明 陈文龙

中国防汛抗旱2025,Vol.35Issue(6):79-82,102,5.
中国防汛抗旱2025,Vol.35Issue(6):79-82,102,5.DOI:10.16867/j.issn.1673-9264.2024164

深圳河流域"2023.9.7"极端特大暴雨下水工程联合调度探讨

Discussion on the joint operation of water projects in the"2023.9.7"extremely heavy rainstorm in Shenzhen River Basin

梁彬锐 1吴辉明 1陈文龙2

作者信息

  • 1. 广州珠科院工程勘察设计有限公司,广州 510610||珠江水利委员会珠江水利科学研究院,广州 510610
  • 2. 珠江水利委员会珠江水利科学研究院,广州 510610
  • 折叠

摘要

Abstract

Shenzhen Municipal Water Affairs Bureau advance planning,careful organization and implementation of the Shenzhen River Basin water works group joint scheduling,successfully prevented the"2023.9.7"extremely heavy rainstorm in Shenzhen,guaranteed the safety of flood control in the Shenzhen River Basin,especially in Luohu and Futian districts in the central city,and effectively reduced the loss of flood disasters.By comprehensively reviewing the joint scheduling process of water projects in the Shenzhen River Basin under the extremely heavy rain conditions of"2023.9.7",sorting out the severe situation faced by the scheduling process,analyzing the joint scheduling methods and effects of water projects such as Shenzhen Reservoir and Sungang Flood Detention Area at different stages of rainfall development,exploring the constraints in the joint scheduling process,proposing countermeasures and suggestions,and providing reference for optimizing the joint scheduling work of water projects in the Shenzhen River Basin.

关键词

深圳河流域/联合调度/极端特大暴雨/水工程群

Key words

Shenzhen River Basin/joint scheduling/extremely heavy rainstorm/water engineering group