煤炭与化工2025,Vol.48Issue(6):36-39,4.DOI:10.19286/j.cnki.cci.2025.06.007
超长工作面过大断面空巷技术研究与应用
Research and application of overlong working face and large cross section empty lane technology
王宇飞 1秦迎 2何万顺 3席智超2
作者信息
- 1. 鄂尔多斯市伊化矿业资源有限责任公司,内蒙古鄂尔多斯 017318
- 2. 郑州煤炭工业(集团)有限责任公司芦沟煤矿,河南郑州 450042
- 3. 中宇悦泰(北京)科技有限公司,北京 101300
- 折叠
摘要
Abstract
There are intricate abandoned roadways in some coal seams of mines,and the supports do not connect to the roof during the mining process,which can easily lead to roof collapse accidents and affect safety production.Based on No.30207 Face of the Muduchaideng Mine,research was conducted on the technology of using high water material pillars to pass through empty roadways.A mechanical model of the roof of the working face passing through the goaf was established,and the stress analysis was carried out to obtain the critical working resistance of the support during the passage through the goaf,and the technical difficulties were analyzed.Measures such as stopping mining and ensuring the working resistance of high water material piers,columns,and supports were proposed.The application showed that during the passage of empty tunnels,the roof of the tunnel was stable,and there was no large-scale collapse of the working face,achieving significant economic and social benefits.关键词
超长工作面/大断面/高水材料墩柱/停采等压Key words
ultra long working face/large cross-section/high water material pier column/stop production and equal pressure分类
矿山工程引用本文复制引用
王宇飞,秦迎,何万顺,席智超..超长工作面过大断面空巷技术研究与应用[J].煤炭与化工,2025,48(6):36-39,4.