海河水利Issue(6):30-33,4.DOI:10.3969/j.issn.1004-7328.2025.06.006
烂泥坳水库除险加固设计方案分析
Reinforcement Design Scheme for the Lanni'ao Reservoir
王举1
作者信息
- 1. 六安市正天水利勘测设计有限公司,安徽 六安 237000
- 折叠
摘要
Abstract
In response to the multiple severe cracks detected in the main dam body,the failure of the discharge structures,and seepage issues in the dam foundation of the Lanni'ao Reservoir,reinforcement measures were proposed based on the current status of the dam,engineering geological conditions,and dam construction requirements.The dam reinforcement scheme was introduced in detail,and its effectiveness and stability were evaluated.The evaluation results indicate that the reinforcement scheme can effectively address the existing dam defects.Furthermore,targeted reinforcement measures were provided for issues such as sand flushing holes,discharge structures,and dam foundation seepage.关键词
小型水库/除险加固/设计Key words
small reservoir/risk elimination and reinforcement/design分类
水利科学引用本文复制引用
王举..烂泥坳水库除险加固设计方案分析[J].海河水利,2025,(6):30-33,4.