| 注册
首页|期刊导航|海河水利|烂泥坳水库除险加固设计方案分析

烂泥坳水库除险加固设计方案分析

王举

海河水利Issue(6):30-33,4.
海河水利Issue(6):30-33,4.DOI:10.3969/j.issn.1004-7328.2025.06.006

烂泥坳水库除险加固设计方案分析

Reinforcement Design Scheme for the Lanni'ao Reservoir

王举1

作者信息

  • 1. 六安市正天水利勘测设计有限公司,安徽 六安 237000
  • 折叠

摘要

Abstract

In response to the multiple severe cracks detected in the main dam body,the failure of the discharge structures,and seepage issues in the dam foundation of the Lanni'ao Reservoir,reinforcement measures were proposed based on the current status of the dam,engineering geological conditions,and dam construction requirements.The dam reinforcement scheme was introduced in detail,and its effectiveness and stability were evaluated.The evaluation results indicate that the reinforcement scheme can effectively address the existing dam defects.Furthermore,targeted reinforcement measures were provided for issues such as sand flushing holes,discharge structures,and dam foundation seepage.

关键词

小型水库/除险加固/设计

Key words

small reservoir/risk elimination and reinforcement/design

分类

水利科学

引用本文复制引用

王举..烂泥坳水库除险加固设计方案分析[J].海河水利,2025,(6):30-33,4.

海河水利

1004-7328

访问量0
|
下载量0
段落导航相关论文