水泥土基层施工时长的试验分析及施工工艺优化

高振中

江西建材Issue(4):281-283,3.
江西建材Issue(4):281-283,3.

水泥土基层施工时长的试验分析及施工工艺优化

Experimental Analysis and Construction Process Optimization of Cement Soil Base Construction Duration

高振中1

作者信息

  • 1. 阜阳市市政工程管理处,安徽 阜阳 236000
  • 折叠

摘要

Abstract

During the acceptance of a cement soil subgrade on a certain road,it was found that the compaction degree and 7-day unconfined compressive strength did not meet the design requirements.For this reason,my project department analyzed the reasons and reviewed the con-struction records,and found that the cement soil construction lasted for as long as 5 hours,which far exceeded the initial setting time of the ce-ment,resulting in a loss of cement strength and unqualified acceptance of the cement soil subgrade.In order to accurately grasp the relation-ship between the strength indicators of cement soil and the variation of construction time,this article conducts experimental analysis on the cor-relation between two inspection indicators of cement soil and construction time,identifies the influencing rules,and optimizes the construction process of the test section to control the construction time not exceeding 3 hours.After completion,all acceptance indicators meet the design re-quirements.

关键词

路基结构/水泥土/施工工艺优化

Key words

Roadbed structure/Cement soil/Optimization of construction technology

分类

建筑与水利

引用本文复制引用

高振中..水泥土基层施工时长的试验分析及施工工艺优化[J].江西建材,2025,(4):281-283,3.

江西建材

1006-2890

访问量0
|
下载量0
段落导航相关论文