大断面软弱围岩隧道施工方案比选分析

何昌军

江西建材Issue(4):224-225,238,3.
江西建材Issue(4):224-225,238,3.

大断面软弱围岩隧道施工方案比选分析

Comparison and Selection Analysis of the Construction Scheme of the Weak Surrounding Rock Tunnel With Large Section

何昌军1

作者信息

  • 1. 四川交通建设集团有限公司,四川 成都 610041
  • 折叠

摘要

Abstract

In order to explore the construction method of large-section soft surrounding rock tunnel and improve the tunnel engineering quality,this paper combined with the construction practice of a tunnel project,proposed two schemes of double-side diversion method and three-step seven-step method,and used MIDAS model for simulation analysis.The practice shows that the maximum shear force occurs in invert and side wall during the construction of double-sidewall heading method and three-step seven-step method.However,by setting large side walls,the double-side wall diversion method can support the arch load,provide protection for the side walls and inverts,and avoid vertical and horizontal displacement.To sum up,in the face of complex geological conditions and large structural stress,double-side wall heading method can im-prove the deformation of side wall and arch and optimize the structural force.

关键词

软弱围岩/大断面隧道/施工方案

Key words

Soft surrounding rock/Large-section tunnel/Construction scheme

分类

交通工程

引用本文复制引用

何昌军..大断面软弱围岩隧道施工方案比选分析[J].江西建材,2025,(4):224-225,238,3.

江西建材

1006-2890

访问量2
|
下载量0
段落导航相关论文