| 注册
首页|期刊导航|铁道运输与经济|基于列生成算法的高速铁路动车组司机乘务计划调整优化

基于列生成算法的高速铁路动车组司机乘务计划调整优化

李沁洋 彭其渊 张永祥 李登辉 冯涛 钟庆伟

铁道运输与经济2025,Vol.47Issue(6):56-66,11.
铁道运输与经济2025,Vol.47Issue(6):56-66,11.DOI:10.16668/j.cnki.issn.1003-1421.2025.06.06

基于列生成算法的高速铁路动车组司机乘务计划调整优化

Crew Schedule Optimization for Rolling Stock Drivers of High Speed Railway via Column Generation Algorithm

李沁洋 1彭其渊 1张永祥 1李登辉 1冯涛 2钟庆伟3

作者信息

  • 1. 西南交通大学 交通运输与物流学院,四川 成都 611756||西南交通大学 综合交通运输智能化国家地方联合工程实验室,四川 成都 611756
  • 2. 西南交通大学 交通运输与物流学院,四川 成都 611756||香港理工大学 工商管理学院,香港 999077
  • 3. 中国民用航空飞行学院空中交通管理学院,四川 广汉 618307
  • 折叠

摘要

Abstract

To adjust and optimize the crew schedule of rolling stock drivers in real time in case of complete section blockage for high speed railway,this paper constructed the connection network for drivers to describe the whole process of drive duty based on the rescheduled train timetable.On the premise that high speed railway crew rules were followed,rescheduling strategies such as crew task cancellation,crew deadheading,change of connections,and use of standby rolling stock drivers were adopted in this paper.To minimize the weighted sum of penalties for crew task cancellations,penalties for deviation from the original crew schedule,and costs of drive duty,an integer linear planning model based on the drive path was built,and a column generation algorithm was designed to solve the model.A set of real-life instances was designed based on the rolling stock service network data from China Railway Zhengzhou Group to verify the effectiveness of the proposed method.Results show that the proposed model and algorithm can solve real-life instances under different sections and start moments of disruptions within 32 seconds,where the computational time satisfies the demand for real-time scheduling.The obtained solution can provide decision support for on-site dispatchers.

关键词

高速铁路/区间完全中断/乘务计划/实时调整/列生成算法

Key words

High Speed Railway/Complete Section Blockage/Crew Schedule/Real-Time Adjustment/Column Generation Algorithm

分类

交通工程

引用本文复制引用

李沁洋,彭其渊,张永祥,李登辉,冯涛,钟庆伟..基于列生成算法的高速铁路动车组司机乘务计划调整优化[J].铁道运输与经济,2025,47(6):56-66,11.

基金项目

国家重点研发计划项目(2022YFB4300502) (2022YFB4300502)

国家自然科学基金项目(72201218,72201268) (72201218,72201268)

四川省自然科学基金项目(2023NSFSC0901) (2023NSFSC0901)

铁道运输与经济

OA北大核心

1003-1421

访问量0
|
下载量0
段落导航相关论文