| 注册
首页|期刊导航|天津建设科技|系梁施工对既有盾构隧道影响的数值模拟

系梁施工对既有盾构隧道影响的数值模拟

陈雅琪

天津建设科技2025,Vol.35Issue(3):14-16,3.
天津建设科技2025,Vol.35Issue(3):14-16,3.DOI:10.3969/j.issn.1008-3197.2025.03.004

系梁施工对既有盾构隧道影响的数值模拟

Numerical Simulation of the Influence of Tie Beam Construction on Existing Shield Tunnel

陈雅琪1

作者信息

  • 1. 中交第二公路勘察设计研究院有限公司,湖北 武汉 430056
  • 折叠

摘要

Abstract

In order to study the impact of construction loads on existing shield tunneld,this study takes the construction of the tie beam at the railway-related pile location in Contract Section A1 of the first phase project of Fuzhou Binhai New City Expressway as a case.The finite element software midas GTS NX was employed for numerical simulation,aiming to analyze the additional stress imposed on the shallow-buried existing shield tunnel and the consequent lining displacement during the tie beam construction process.Based on the simulation results,an assessment was made to determine whether the tie beam construction scheme complies with relevant specifi-cations,thereby ensuring the safe operation of the existing tunnel.

关键词

系梁/施工荷载/盾构隧道

Key words

tie beam/construction load/shield tunnel

分类

交通工程

引用本文复制引用

陈雅琪..系梁施工对既有盾构隧道影响的数值模拟[J].天津建设科技,2025,35(3):14-16,3.

天津建设科技

1008-3197

访问量0
|
下载量0
段落导航相关论文