Effective implementation of controlled blasting methodology during excavation of hard rock in the close proximity of earthen dam and tunnel

Prakash K.Palei Vijay K.Ghodake S.Santhosh Kumar R.S.Gurjar Chaman Singh M.Meena Rizwan Ali R.S.Kankara

防务技术2025,Vol.48Issue(6):306-316,11.
防务技术2025,Vol.48Issue(6):306-316,11.DOI:10.1016/j.dt.2025.02.026

Effective implementation of controlled blasting methodology during excavation of hard rock in the close proximity of earthen dam and tunnel

Effective implementation of controlled blasting methodology during excavation of hard rock in the close proximity of earthen dam and tunnel

Prakash K.Palei 1Vijay K.Ghodake 1S.Santhosh Kumar 1R.S.Gurjar 1Chaman Singh 1M.Meena 1Rizwan Ali 1R.S.Kankara1

作者信息

  • 1. Central Water and Power Research Station,Pune 411024,India
  • 折叠

摘要

关键词

Controlled blasting/Civil structure/Ground vibration/Attenuation relation

Key words

Controlled blasting/Civil structure/Ground vibration/Attenuation relation