电力勘测设计Issue(6):29-32,86,5.DOI:10.13500/j.dlkcsj.issn1671-9913.2025.06.006
配置平衡发电机双机回热系统在百万机组中的应用
Application of Dual Turbine Regenerative System with Balance Generator in 1 000 MW Units
王娟 1王巍 1袁琦2
作者信息
- 1. 中国电力工程顾问集团中南电力设计院有限公司,湖北 武汉 430071
- 2. 国家能源集团岳阳发电有限公司,湖南 岳阳 414000
- 折叠
摘要
Abstract
This article relies on the actual example of 1 000 MW unit of a balancing generator equipped with a dual-machine regenerative system that has been successfully put into operation,and conducts research on the practical application of this system in 1 000 MW unit.Through the research on the wiring of the electrical system,combined with the practice in the power plant,its advantages and disadvantages are summarized,and professional suggestions on the equipment configuration and layout of the electrical system are put forward.After systematic analysis,a reasonable and targeted optimization scheme is given,aiming to fully improve the operation efficiency of the dual-machine regenerative system in 1 000 MW unit.关键词
双机回热系统/平衡发电机/电气接线Key words
echelon cycle system/balance generator/electrical wiring分类
动力与电气工程引用本文复制引用
王娟,王巍,袁琦..配置平衡发电机双机回热系统在百万机组中的应用[J].电力勘测设计,2025,(6):29-32,86,5.