地下空间(英文)2025,Vol.20Issue(2):46-68,23.DOI:10.1016/j.undsp.2024.03.006
Model test on cutterhead-soil interaction during shield tunneling and its theoretical model
Model test on cutterhead-soil interaction during shield tunneling and its theoretical model
摘要
关键词
Shield machine/Cutterhead/Tunneling load/Model test/InteractionKey words
Shield machine/Cutterhead/Tunneling load/Model test/Interaction引用本文复制引用
Xiang Shen,Dajun Yuan,Dalong Jin,Xiangsheng Chen,Weiping Luo,Yuansheng Peng,Kai Duan..Model test on cutterhead-soil interaction during shield tunneling and its theoretical model[J].地下空间(英文),2025,20(2):46-68,23.基金项目
The authors gratefully acknowledge the financial sup-port by the National Natural Science Foundation of China(Grant Nos.52378404 and 52108377),Foundation for Basic and Applied Basic Research of Guangdong Province,China(Grant No.2023A1515010060),and Open Project Foundation of the Key Laboratory of Urban Under-ground Engineering of Ministry of Education,China(Bei-jing Jiaotong University)(Grant No.TUL2023-03). (Grant Nos.52378404 and 52108377)