| 注册
首页|期刊导航|电力系统保护与控制|新型电力系统下核电机组涉网运行风险评估综述

新型电力系统下核电机组涉网运行风险评估综述

翟常营 顾秋斌 马红星 侯可馨 姜毅 李岩 谢庆

电力系统保护与控制2025,Vol.53Issue(12):173-187,15.
电力系统保护与控制2025,Vol.53Issue(12):173-187,15.DOI:10.19783/j.cnki.pspc.241457

新型电力系统下核电机组涉网运行风险评估综述

Review of grid-connected operation risk assessment for nuclear power units in the context of new power systems

翟常营 1顾秋斌 1马红星 1侯可馨 2姜毅 1李岩 2谢庆2

作者信息

  • 1. 福建福清核电有限公司,福建 福清 350300
  • 2. 华北电力大学(保定),河北 保定 071003
  • 折叠

摘要

Abstract

Nuclear power is an important basis for building a clean and low-carbon new power system.However,this emerging power system is characterized by reduced system inertia and diminished disturbance resilience,introducing unclear risks to the grid-connected operation of nuclear power units.This paper first summarizes the characteristics of the new power system and discusses its influence on the stability of nuclear power units.Then,it introduces the basic operation characteristics and safe operation principles of nuclear power plants,while the interaction between nuclear power units and the power grid is also analyzed.Furthermore,this paper explores the potential grid-integration risks faced by nuclear power units under the new power system and presents risk assessment methods based on uncertainty analysis.Finally,it discusses strategies to mitigate these risks and proposes recommendations for optimal operation.This study aims to provide theoretical support and practical guidance for ensuring the safe operation of nuclear power units in new power systems.

关键词

新型电力系统/核电/风险评估/不确定性风险/涉网运行

Key words

new power system/nuclear power/risk assessment/uncertainty risk/grid-connected operation

引用本文复制引用

翟常营,顾秋斌,马红星,侯可馨,姜毅,李岩,谢庆..新型电力系统下核电机组涉网运行风险评估综述[J].电力系统保护与控制,2025,53(12):173-187,15.

基金项目

This work is supported by the National Natural Science Foundation of China(No.52277147). 国家自然科学基金项目资助(52277147) (No.52277147)

北京市自然科学基金项目资助(3222057) (3222057)

电力系统保护与控制

OA北大核心

1674-3415

访问量0
|
下载量0
段落导航相关论文