Based on the example of a two-story basement project in Jiangbei District,Ningbo City,the SMW construction method pile support system was adopted near the municipal road side of the foundation pit and the expected results were achieved.The treatment measures for soil leakage between piles,the development of a fertilizer tank compaction vibrator,and the removal of steel section jumping were elaborated,along with solutions.Finally,the quality control points and precautions for the application of SMW construction method piles in deep foundation pit construction in soft soil areas were summarized for reference in similar projects in the future.关键词
SMW工法桩/软土地区/超深基坑/变形控制Key words
SMW construction method piler/Soft soil area/Ultra-deep foundation pit/Deformation control分类
建筑与水利