This paper take the example where the bearing capacity of test piles in a certain project fails to meeted the requirements,It was analysed conducts result,which determined the final cause through on-site core drilling.Specific solutions and treatment measures are proposed from aspects such as sediment control and grouting technology.After adjusting the construction plan then re-testing the piles,Finally the designed requirements was satisfied by bearing capacity.This avoids plan adjustments brings good economic benefits,and plays a positive guiding role for the large-scale construction of subsequent engineering piles.关键词
后注浆/钻孔灌注桩/处理措施Key words
Post-grouting/Bored-grouting pile/Treatment measures分类