工期延误分析方法研究
Study on Analysis Methods for Construction Delays
摘要
Abstract
This paper systematically studied existing analysis methods for construction delays,and thoroughly interpreted their attributes,applicable scope,and constraints to reveal the applicability of different methods.On this basis,this paper identified the key factors influencing the selection of analysis methods for construction delays,and built a model for the selection of optimal analysis methods for construction delays based on the Analytic Network Process(ANP),which could provide decision-making support and a theoretical basis for engineering project management in China.关键词
工期延误/分析方法优选/ANP模型/工程索赔Key words
construction delay/selection of optimal analysis methods/ANP model/engineering claim分类