工业厂房预应力筋张拉施工方案对材料用量及工程造价的影响

李荣花

江西建材Issue(5):324-325,331,3.
江西建材Issue(5):324-325,331,3.

工业厂房预应力筋张拉施工方案对材料用量及工程造价的影响

Influence of Tensioning Construction Scheme of Prestressed Tendons on Material Consumption and Project Cost in Industrial Building

李荣花1

作者信息

  • 1. 济南天泽建设工程项目管理有限公司,山东 济南 250000
  • 折叠

摘要

Abstract

In order to determine the best tensioning construction scheme of prestressed reinforcement,this paper takes an industrial plant in example to compare and analyze the total material consumption,project cost and construction period of two tensioning construction schemes of prestressed reinforcement.The results show that the cost of rebar in scheme 1 accounts for 55.31%;The leasing costs of admixtures and steel pipes were 3.1%and 3.17%,respectively.In scheme 2,the cost of reinforcement is 72.05%,and the cost of concrete is 27.95%.Compared with the first scheme,the economic cost of the second scheme is about 180,000 yuan,and the construction period is shortened by 10 to 14 days.In short,scheme 2 has significant economic benefits and construction efficiency,so it is recommended to use scheme 2 to carry out the tensile scheme of prestressed steel bars in the industrial plant.

关键词

工业厂房/预应力张拉/工程造价/施工周期

Key words

Industrial plant/Prestressed tension/Project cost/Construction period