| 注册
首页|期刊导航|四川水力发电|某引水隧洞衬砌混凝土外观质量缺陷成因分析及控制措施

某引水隧洞衬砌混凝土外观质量缺陷成因分析及控制措施

刘胜虎 李东强 吴桃 赵云龙

四川水力发电2025,Vol.44Issue(z1):40-43,47,5.
四川水力发电2025,Vol.44Issue(z1):40-43,47,5.DOI:10.20196/j.cnki.scslfd.2025S111

某引水隧洞衬砌混凝土外观质量缺陷成因分析及控制措施

Cause Analysis and Conctrol Measures of Appearance Quality Defects in Concrete Lining of a Headrace Tunnel

刘胜虎 1李东强 1吴桃 1赵云龙1

作者信息

  • 1. 中国水利水电第十工程局有限公司,四川 成都 610036
  • 折叠

摘要

Abstract

The appearance quality of the lining concrete of the headrace tunnel of the hydropower project not on-ly affects the appearance of the concrete,but also seriously affects the durability of the tunnel and the cost of subsequent appearance quality defect treatment.This paper focuses on the reasons for the appearance defects of the lining concrete of the hydropower project and the control measures.

关键词

衬砌混凝土/外观质量/缺陷分析/控制措施/引水隧洞

Key words

concrete lining/appearance quality/defect analysis/control measures/headrace tunnel

分类

水利科学

引用本文复制引用

刘胜虎,李东强,吴桃,赵云龙..某引水隧洞衬砌混凝土外观质量缺陷成因分析及控制措施[J].四川水力发电,2025,44(z1):40-43,47,5.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文