莱比塘铜矿露天采场西山高边坡各平台的安全整治

宋自平 马松华 刘李 张定文 李健

四川水力发电2025,Vol.44Issue(z1):55-57,3.
四川水力发电2025,Vol.44Issue(z1):55-57,3.DOI:10.20196/j.cnki.scslfd.2025S115

莱比塘铜矿露天采场西山高边坡各平台的安全整治

Safety Rectification of Each Platform of High Slope in West Mountain of Letpadaung Copper Mine Open-pit Mining Area

宋自平 1马松华 1刘李 1张定文 1李健1

作者信息

  • 1. 中国水利水电第十工程局有限公司,四川 成都 610037
  • 折叠

摘要

Abstract

The difference of elevation between the top of the west mountain and the bottom of the open-pit for Letpadaung copper mine project has reached more than 400 m,and the high slope of the end slope has reached more than 200 m.The importance of safety and stability of high slope in mining management has become more and more prominent.Through the integrated treatment of organized drainage of the formed slope cleaning platform and safety platform to reduce the erosion of the slope surface by atmospheric precipitation and slope confluence,reduce and prevent shallow slope landslide,and ensure the stability of the slope,preliminary re-search has been done and preliminary results have been achieved in the mine project,with a view to providing efective and economic solutions for the folow-up high slope renovation of the project,meanwhile,providing ref-erence for similar projects.

关键词

莱比塘铜矿/露天采场/终了坡面/高边坡/平台安全整治

Key words

Letpadaung copper mine/open pit/end slope/high slope/llatform safety rectification