四川水力发电2025,Vol.44Issue(z1):71-74,4.DOI:10.20196/j.cnki.scslfd.2025S120
昌波水电站调压室交通洞布置研究
Study on Layout of Traffic Tunnel in Surge Chamber of Changbo Hydropower Project
米云彤 1秦晓亮 1房彬1
作者信息
- 1. 中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳 550081
- 折叠
摘要
Abstract
The traffic tunnel of the surge chamber of Changbo Hydropower Project is a construction passage and traffic passage connecting the surge chamber with the outside world.The rationality of its design is very im-portant to the construction and operation of the surge chamber.It is necessary to consider geological condi-tions,construction site layout,interference to external traffic conditions,construction period impact,investment impact and other factors to design and select the layout of the traffic hole in the surge chamber and determine the optimal layout.The relevant design results can provide reference for similar projects.关键词
昌波水电站/调压室交通洞/平面布置/布置比较Key words
Changbo Hydropower Project/traffic tunnel of the surge chamber/plane layout/layout comparison分类
水利科学引用本文复制引用