Considering the conditions of topography,geology,engineering construction,safety operation of reser-voir area and hub buildings,the layout of water discharge and energy dissipation structure of Changbo Hydro-power Project is studied and compared,and the 5-hole sluice gate+1-hole ecological flow and sluice gate are finally adopted for the drainage structure of this project.The energy dissipation method adopts bottom current energy dissipation,and adopts the combination of stilling pool and tail sill to obtain better energy dissipation effect.关键词
泄水建筑物/消能建筑物/泄洪闸/方案比选Key words