四川水力发电2025,Vol.44Issue(z1):139-142,4.DOI:10.20196/j.cnki.scslfd.2025S135
昌波水电站项目建设过程中的合同及造价管理研究
Research on Contract and Cost Management during the Construction Process of Changbo Hydropower Project
张晓静 1李和谋 2褚云1
作者信息
- 1. 华电金沙江上游水电开发有限公司昌波分公司,西藏 昌都 854000
- 2. 华电金沙江上游水电开发有限公司昌波分公司,西藏 昌都 854000||华电金沙江上游水电开发有限公司,四川 成都 610000
- 折叠
摘要
Abstract
Water conservancy and hydropower engineering has a long construction period,large investment,and high technical requirements.In the process of hydropower project construction,the research on contract management is a systematic process that runs through the entire construction process.Strengthening contract management can effec-tively control the engineering quality and progress on the construction site,and predict the risks of engineering change claims in a timely manner,effectively safeguarding the interests of enterprises.This article explores contract manage-ment throughout the entire process of water conservancy and hydropower engineering construction from the perspec-tive of Construction Unit,and studies and discusses solutions to problems that arise during the process.关键词
水利水电工程/合同管理/造价管理Key words
water conservancy and hydropower engineering/contract management/cost management分类
建筑与水利引用本文复制引用
张晓静,李和谋,褚云..昌波水电站项目建设过程中的合同及造价管理研究[J].四川水力发电,2025,44(z1):139-142,4.