| 注册
首页|期刊导航|四川水力发电|毗河供水一期工程中采用的泥结石道路施工技术

毗河供水一期工程中采用的泥结石道路施工技术

田燕龙 赵文剑 王奕兵

四川水力发电2025,Vol.44Issue(3):11-14,4.
四川水力发电2025,Vol.44Issue(3):11-14,4.DOI:10.20196/j.cnki.scslfd.20250304

毗河供水一期工程中采用的泥结石道路施工技术

Application of Mudstone Road Construction in the First Phase of Pihe Water Supply Project

田燕龙 1赵文剑 1王奕兵1

作者信息

  • 1. 中国水利水电第十工程局有限公司,四川 成都 610036
  • 折叠

摘要

Abstract

In traditional water conservancy and hydropower projects,the management of highways usually uses concrete or asphalt pavement,which not only can bear heavy traffic volume,but also has aflat,solid surface,good comfort,and ensures high-speed driving.However,the corresponding cost will also be high.This project belongs to alinear water conservancy project with low traffic volume and is only used for seasonal inspections during the flood season.Usually,the usage rate is low.Therefore,mud and stone pavement is chosen as the preferred choice for highway management,with low cost,convenient maintenance and repair,and high cost-ef-fectiveness.This paper introduces the mud-stone road construction technology used in the first phase of the Pihe River Water Supply Project.

关键词

毗河供水一期工程/泥结石道路/性价比/施工技术

Key words

First Phase of Pihe Water Supply Project/mud stone road/high cost-effectiveness/construction technology

分类

水利科学

引用本文复制引用

田燕龙,赵文剑,王奕兵..毗河供水一期工程中采用的泥结石道路施工技术[J].四川水力发电,2025,44(3):11-14,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文