| 注册
首页|期刊导航|四川水力发电|亚洲已建的最大灯泡贯流式机组老挝东萨宏水电站管型座安装技术

亚洲已建的最大灯泡贯流式机组老挝东萨宏水电站管型座安装技术

陈海峰 吴古金 王仕平

四川水力发电2025,Vol.44Issue(3):45-48,4.
四川水力发电2025,Vol.44Issue(3):45-48,4.DOI:10.20196/j.cnki.scslfd.20250314

亚洲已建的最大灯泡贯流式机组老挝东萨宏水电站管型座安装技术

Installation Technology of the the Bulb Tubular Seats for the Largest Bulb Tubular Units in Asia at the Don Sahong Hydropower Project in Laos

陈海峰 1吴古金 1王仕平1

作者信息

  • 1. 中国水利水电第十工程局有限公司,四川 成都 610036
  • 折叠

摘要

Abstract

This paper mainly analyzes and summarizes the assembly and hoisting methods of the tubular seat a-dopted in the Don Sahong Hydropower Project in Laos.By changing the traditional loose parts hoisting meth-od,it is changed to a one-time hoisting method of the whole assembly in the installation room and then hoisted into place by the factory bridge crane.This method saves construction time,reduces the content of high-alti-tude operations,increases safety and quality assurance,and improves the working conditions of workers.At the same time,it provides a good reference for the tubular seat hoisting construction under similar conditions.

关键词

东萨宏水电站/灯泡贯流式机组/座环施工/组装/吊装就位

Key words

Don Sahong Hydropower Project/bulb tubular units/stay ring construction/assembly/hoisting into place

分类

建筑与水利

引用本文复制引用

陈海峰,吴古金,王仕平..亚洲已建的最大灯泡贯流式机组老挝东萨宏水电站管型座安装技术[J].四川水力发电,2025,44(3):45-48,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文