Based on the actual situation of the Jiulongshan 220 kV Step-Up Substation Project in Yunnan,this article briefly introduces the serious problem of excessive grounding resistance in the grounding network en-countered during the construction process of the project,and the measures taken to reduce resistance-the idea and calculation of deep well ion grounding scheme.Ultimately,effective resistance reduction was achieved,sol-ving the practical problems of the project and providing reference for similar technical problems.

关键词

九龙山风电场/接地电阻/降阻措施/深井离子接地

Key words

Jiulongshan Wind Farm/grounding resistance/resistance reduction measures/deep well ion ground-ing