四川水力发电2025,Vol.44Issue(3):100-102,3.DOI:10.20196/j.cnki.scslfd.20250326
水电站气垫式调压室气系统空压机选择优化
Selection and Optimization of Air Compressors for the Air System of Air Cushion Surge Chamber of Hydropower Project
董志浩 1陈树林 2杨飞2
作者信息
- 1. 长垣川能投水务北区生态水系建设管理有限公司,河南 长垣 453400
- 2. 中国电建集团成都勘测设计研究院有限公司,四川 成都 610072
- 折叠
摘要
Abstract
The air system is the technical support and guarantee for the successful application and safe and relia-ble operation of the air cushion surge chamber of hydropower project,and air compressors are the key core e-quipment of the air system.According to the characteristics that the inflating and replenishing of air cushion surge chamber are in different operating periods of hydropower project,the selection and configuration of the air compressors for air system inflation and air replenment are organically unified and comprehensively consid-ered,and the optimal selection can not only meet the needs of air system inflation for pressure construction and automatic air replenment for pressure maintenance,but also save the configuration,layout,investment,opera-tion and maintenance costs of air compressors and their auxiliary equipment,which can provide references for similar projects.关键词
气垫式调压室/气系统/空压机/水电站Key words
air cushion surge chamber/air system/air compressor/hydropower project分类
建筑与水利引用本文复制引用
董志浩,陈树林,杨飞..水电站气垫式调压室气系统空压机选择优化[J].四川水力发电,2025,44(3):100-102,3.