四川水力发电2025,Vol.44Issue(3):160-163,4.DOI:10.20196/j.cnki.scslfd.20250339
针对复杂地质的顶管施工应力优化方法
Stress optimization methods for pipe jacking construction in complex geology
卓建军1
作者信息
- 1. 广东省源天工程有限公司,广东 广州 511340
- 折叠
摘要
Abstract
In recent years,with the increasing complexity of underground engineering,pipe jacking technology,as an efficient trenchless construction method,has been widely applied in the construction of urban under-ground infrastructure.Compared with traditional excavation methods,pipe jacking construction has advantages such as minimal environmental impact and fast construction speed.However,under complex geological condi-tions such as soft soil layers and sand-gravel layers,the management and optimization of construction stress be-come particularly critical.Taking a comprehensive underground utility tunnel project in Guangzhou as an ex-ample,this paper discusses the stress optimization methods for pipe jacking construction in complex geological conditions such as alternating soft soil-sand gravel layers.关键词
顶管施工/复杂地质/应力管理/工艺创新/非开挖技术Key words
pipe jacking construction/complex geology/stress management/process innovation/trenchless con-struction method分类
机械制造引用本文复制引用
卓建军..针对复杂地质的顶管施工应力优化方法[J].四川水力发电,2025,44(3):160-163,4.