| 注册
首页|期刊导航|四川水力发电|针对复杂地质的顶管施工应力优化方法

针对复杂地质的顶管施工应力优化方法

卓建军

四川水力发电2025,Vol.44Issue(3):160-163,4.
四川水力发电2025,Vol.44Issue(3):160-163,4.DOI:10.20196/j.cnki.scslfd.20250339

针对复杂地质的顶管施工应力优化方法

Stress optimization methods for pipe jacking construction in complex geology

卓建军1

作者信息

  • 1. 广东省源天工程有限公司,广东 广州 511340
  • 折叠

摘要

Abstract

In recent years,with the increasing complexity of underground engineering,pipe jacking technology,as an efficient trenchless construction method,has been widely applied in the construction of urban under-ground infrastructure.Compared with traditional excavation methods,pipe jacking construction has advantages such as minimal environmental impact and fast construction speed.However,under complex geological condi-tions such as soft soil layers and sand-gravel layers,the management and optimization of construction stress be-come particularly critical.Taking a comprehensive underground utility tunnel project in Guangzhou as an ex-ample,this paper discusses the stress optimization methods for pipe jacking construction in complex geological conditions such as alternating soft soil-sand gravel layers.

关键词

顶管施工/复杂地质/应力管理/工艺创新/非开挖技术

Key words

pipe jacking construction/complex geology/stress management/process innovation/trenchless con-struction method

分类

机械制造

引用本文复制引用

卓建军..针对复杂地质的顶管施工应力优化方法[J].四川水力发电,2025,44(3):160-163,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文