四川水力发电2025,Vol.44Issue(z1):1-4,23,5.DOI:10.20196/j.cnki.scslfd.2025S101
巴拉水电站特大断面隧洞开挖支护与边顶拱衬砌同步施工技术
Construction Technology of Concurrent Excavation Support and Side-Wall and Roof Arch Lining for Super Large Section Tunnels in Bala Hydropower Project
唐洪应 1刘胜虎 1李东强 1王俊1
作者信息
- 1. 中国水利水电第十工程局有限公司,四川 成都 610036
- 折叠
摘要
Abstract
Given that the excavation and support,as well as the concrete lining of the extra-large section tunnel in Bala Hydropower Project,are both located on the critical route and occupy a linear construction period.Dur-ing the construction process,various factors may cause delays in the project schedule.To solve the problem of delayed construction period,the construction technology of side and top arch concrete lining has been adopted while excavating and supporting the tunnel,achieving parallel operation of excavation support and concrete lin-ing,thereby accelerating the construction progress and ensuring the realization of the total construction period.关键词
特大断面隧洞/开挖支护/边顶拱衬砌/同步施工/巴拉水电站Key words
super large section tunnel/excavation and support/side-wall and roof arch lining/concurrent con-struction/Bala Hydropower Project分类
建筑与水利引用本文复制引用
唐洪应,刘胜虎,李东强,王俊..巴拉水电站特大断面隧洞开挖支护与边顶拱衬砌同步施工技术[J].四川水力发电,2025,44(z1):1-4,23,5.