铁路通信信号工程技术2024,Vol.21Issue(z1):14-16,3.DOI:10.3969/j.issn.1673-4440.2024.Z1.004
列控中心边界区段列车出清后闪红光带分析
Analysis of Red-light Strap Faults After Train Clearance in Boundary Section of Train Control Center
江亲发1
作者信息
- 1. 中国铁路广州局集团有限公司惠州电务段,广东 惠州 516000
- 折叠
摘要
Abstract
After the tuning zone was included in the control inspection of the Train Control Center(TCC),a delay occurred in the transmission of the status of a small track circuit from the track circuit of the boundary section of the neighboring station to the TCC of the current station.As a result,after relay GJ was energized at the current station,the TCC once again received information from the neighboring station indicating that the small track circuit of the boundary section was occupied,even though the TCC had determined that the logic state of the section was clear.This inconsistency resulted in a flashing red-light strap in the boundary section of the current station,which affected the reliable operation of the signal equipment.This article analyzes the aforementioned issues and proposes corresponding improvement plans and measures.关键词
列控中心/小轨状态传递/红光带Key words
train control center/transfer of the status of small track circuit/red-light strap分类
交通工程引用本文复制引用
江亲发..列控中心边界区段列车出清后闪红光带分析[J].铁路通信信号工程技术,2024,21(z1):14-16,3.