铁路通信信号工程技术2024,Vol.21Issue(z1):137-143,7.DOI:10.3969/j.issn.1673-4440.2024.Z1.034
站内一体化轨道电路道床漏泄精准定位方法
Accurate Positioning Method for Leakage of Integrated Track Circuit Bed in Station
苟建朋1
作者信息
- 1. 中国铁路呼和浩特局集团有限公司,呼和浩特 010030
- 折叠
摘要
Abstract
The integrated track circuit,as an important format for station track circuits,directly relates to the safe and efficient operation of high-speed railways through its stable application.Ballast bed leakage has been a common issue in recent years during the operation of high-speed railways,which can lead to serious faults such as red light bands when severe.This article uses the investigation of typical cases of ballast bed leakage in station integrated sections as an example.It proposes a method for accurately identifying leakage areas by combining historical data analysis,on-site investigation and testing,and simulation modeling calculations.This approach provides reference for railway operations and maintenance.关键词
轨道电路/道床漏泄/钢轨电流Key words
tract circuit/ballast leakage/rail current分类
交通工程引用本文复制引用
苟建朋..站内一体化轨道电路道床漏泄精准定位方法[J].铁路通信信号工程技术,2024,21(z1):137-143,7.