| 注册
首页|期刊导航|岩土工程学报|基坑地下水回灌模型试验研究

基坑地下水回灌模型试验研究

曾超峰 陈宏波 王硕 薛秀丽 蔡钢 朱彤 韩磊 徐长节

岩土工程学报2025,Vol.47Issue(7):1536-1544,9.
岩土工程学报2025,Vol.47Issue(7):1536-1544,9.DOI:10.11779/CJGE20240200

基坑地下水回灌模型试验研究

Laboratory model tests on artificial groundwater recharge in deep excavation

曾超峰 1陈宏波 1王硕 1薛秀丽 1蔡钢 1朱彤 2韩磊 3徐长节4

作者信息

  • 1. 湖南科技大学岩土工程稳定控制与健康监测湖南省重点实验室,湖南 湘潭 411201||湖南科技大学土木工程学院,湖南 湘潭 411201
  • 2. 中国建筑股份有限公司,北京 100029
  • 3. 中国建筑第八工程局有限公司,上海 200122
  • 4. 华东交通大学轨道交通基础设施性能监测与保障国家重点实验室,江西 南昌 330013
  • 折叠

摘要

Abstract

Dewatering inside an excavation can induce significant surrounding ground settlement.The artificial groundwater recharge is commonly employed to limit the dewatering-induced ground settlement.Generally,it is necessary to carry out a series of preliminary tests to check the recharge effects and then determine the formal recharge operation scheme.If the scaling physical modelling of various recharge conditions can be reproduced in the laboratory environment,it will provide a more economical and efficient method to establish optimal recharge schemes.In this study,based on a practical excavation of metro station in Tianjin,the laboratory-scale dewatering and recharge tests are conducted to explore the feasibility of reproducing the effects of artificial recharge on limiting groundwater drawdown and ground settlement in the laboratory.With installation of observation wells,displacement sensors and stress sensors,the time-history variations of water level inside and outside the excavation,enclosure wall deflections,pore water pressure and earth pressure at both sides of the wall,and ground surface settlement are monitored during the dewatering and recharge tests.The results show that:(1)The groundwater drawdown induced by dewatering and groundwater level rise caused by recharge can be well reproduced in laboratory environment,demonstrating the feasibility of laboratory-scale model tests on dewatering and recharge.(2)When recharge is carried out in close proximity to the enclosure wall,the water pressure around the bottom of the recharge wells increases significantly,which can make the enclosure wall at the same buried depth move inward to the excavation,subsequently leading to ground settlement outside the excavation.In practical engineering,engineers should carefully determine the recharge rates of the wells located near the enclosure wall to prevent large wall deflections and subsequent settlement increment.For the projects that require strict control over surface deformation,it is not advisable to place recharge wells in the vicinity of the enclosure wall.

关键词

基坑降水/地下水回灌/地表沉降/变形控制/模型试验

Key words

excavation dewatering/artificial groundwater recharge/ground surface settlement/deformation control/model test

分类

建筑与水利

引用本文复制引用

曾超峰,陈宏波,王硕,薛秀丽,蔡钢,朱彤,韩磊,徐长节..基坑地下水回灌模型试验研究[J].岩土工程学报,2025,47(7):1536-1544,9.

基金项目

国家自然科学基金项目(52478342,52238009) (52478342,52238009)

湖南省科技创新计划项目(2022RC1172) (2022RC1172)

江西省自然科学基金项目(20223BBG71018)This work was supported by the National Natural Science Foundation of China(Grant Nos.52478342,52238009),the Science and Technology Innovation Program of Hunan Province(Grant No.2022RC1172)and the Natural Science Foundation of Jiangxi Province(Grant No.20223BBG71018). (20223BBG71018)