| 注册
首页|期刊导航|中国医学装备|基于模糊综合评价模型构建的医院生命支持类设备评价指标体系研究

基于模糊综合评价模型构建的医院生命支持类设备评价指标体系研究

倪良军 陈伟健 黄伟杰 张霞

中国医学装备2025,Vol.22Issue(6):113-118,6.
中国医学装备2025,Vol.22Issue(6):113-118,6.DOI:10.3969/j.issn.1672-8270.2025.06.022

基于模糊综合评价模型构建的医院生命支持类设备评价指标体系研究

Evaluation index system of life support equipment of hospital based on fuzzy comprehensive evaluation model

倪良军 1陈伟健 1黄伟杰 1张霞1

作者信息

  • 1. 江门市妇幼保健院设备和采购科 江门 529000
  • 折叠

摘要

Abstract

Objective:To construct a fuzzy comprehensive evaluation model for life support equipment of hospital,so as to improve quality of management for equipment.Methods:Based on the operating status of life support equipment in Jiangmen Maternal and Child Health Care Hospital of Guangdong Province,a fuzzy comprehensive evaluation model was constructed,and the indicators of different levels were set.The index weights were calculated according to the Analytic Hierarchy Process(AHP),and the equipment management strategy was formulated based on the evaluated results.A total of 98 life support equipment in clinical use in our hospital from January 2023 to July 2024 were selected.In them,49 equipment were managed under the conventional management mode,and the other 49 equipment were managed under the assessment system management mode of the kind of life support equipment based on fuzzy comprehensive evaluation model(model management mode)according to the random number table method.The timeliness,management effect and management efficiency of the two management modes for equipment were compared.A self-made satisfaction questionnaire was used to investigate the satisfaction scores of equipment engineers,clinicians and managers of relevant departments in usage management for equipment in the equipment usage of the two management modes.Results:The timeliness of equipment early warning,the timeliness of maintenance personnel's arrival,and the timeliness of proposing maintenance opinions were respectively(0.78±0.14)min,(5.14±2.11)min,and(10.69±3.11)min in the model management mode,all which were shorter than those in the conventional management mode,and the differences were statistically significant(t=16.697,11.857,16.117,P<0.05).The regular maintenance rate of equipment adopting the model management mode was higher than that adopting the conventional management mode,and the failure rate was lower than that adopting the conventional management mode,and the differences were statistically significant(x2=12.274,12.261,P<0.05),respectively.The maintenance time of the model management mode was shorter than that of the conventional management mode,and the operation and maintenance cost of the model management mode was lower than that of the conventional management mode,and the differences were statistically significant(t=17.451,12.707,P<0.05).The scores of management efficiencies of resource allocation,technical support,environmental guarantee and information infrastructure of the model management mode were all higher than those of the conventional management mode,and the differences were statistically significant(t=12.268,14.908,16.128,13.920,P<0.05).In usage management for equipment,the satisfaction scores of equipment engineers,clinicians and managers of relevant departments for equipment management adopting the model management mode were higher than those adopting the conventional management mode,and the differences were statistically significant(t=13.118,16.209,12.557,P<0.05).Conclusion:The assessment system of hospital for life support equipment based on the fuzzy comprehensive evaluation model can enhance the quality of management and operation for equipment,and improve the service level of equipment,and increase the operational efficiency of equipment.

关键词

模糊综合评价模型/层次分析法/生命支持类设备/评价指标/管理效果

Key words

Fuzzy comprehensive evaluation model/Analytic hierarchy process(AHP)/Life support equipment/Evaluation index/Management effect

分类

医药卫生

引用本文复制引用

倪良军,陈伟健,黄伟杰,张霞..基于模糊综合评价模型构建的医院生命支持类设备评价指标体系研究[J].中国医学装备,2025,22(6):113-118,6.

中国医学装备

1672-8270

访问量3
|
下载量0
段落导航相关论文