| 注册
首页|期刊导航|北京交通大学学报|高速铁路线网热备动车组配置优化模型

高速铁路线网热备动车组配置优化模型

曲云腾 杨世瑞 杨军 赵东升 赵鹏

北京交通大学学报2025,Vol.49Issue(4):1-8,8.
北京交通大学学报2025,Vol.49Issue(4):1-8,8.DOI:10.11860/j.issn.1673-0291.20240104

高速铁路线网热备动车组配置优化模型

Optimization model for hot standby EMU configuration in high-speed railway networks

曲云腾 1杨世瑞 2杨军 3赵东升 4赵鹏4

作者信息

  • 1. 北京交通大学 交通运输学院,北京 100044||中国国家铁路集团有限公司 科技和信息化部,北京 100844
  • 2. 中国铁路设计集团有限公司 交通运输规划研究院,天津 300308
  • 3. 中国铁路北京局集团有限公司,北京 100089
  • 4. 北京交通大学 交通运输学院,北京 100044
  • 折叠

摘要

Abstract

The configuration of hot standby EMUs in high-speed railway networks directly affects emergency response efficiency and operational costs.To address issues such as coarse management and inadequate risk coverage in existing configuration approaches,this study proposes an optimization method based on comprehensive accident risk coverage across the network.First,considering both the timeliness and cost-effectiveness of emergency response,a multi-objective planning model is con-structed with dual objectives to minimize emergency response time and configuration costs for hot standby EMUs.The model integrates point coverage and arc segment coverage methods to accurately represent the requirements for sequential tasks and inter-section rescue scenarios.It incorporates con-straints related to emergency rescue point demands,response time limits,and full coverage of risk points,enabling effective adaptation to complex railway networks and the uncertainty of sudden inci-dents.Second,the ε-constraint method is used to solve the model,overcoming limitations associated with traditional weighted coefficient methods such as dimension normalization and parameter setting.This approach generates multiple sets of Pareto-optimal solutions,providing flexible options for decision-making.Finally,a case study is conducted on the high-speed railway network managed by a specific railway bureau.The research results indicate that the model produces reasonable configuration schemes aligned with various optimization objectives.As the number of hot standby EMUs increases,the maximum reduction in emergency response time reaches 29.3%,while configuration costs remain effectively controlled.Sensitivity analysis confirm the model's strong adaptability to varying response time constraints and risk point distribution characteristics.This method provides a theoretical basis and practical guidance for the scientific configuration of hot standby EMUs and serves as a reference for enhancing the emergency management system of high-speed railways.

关键词

交通运输规划与管理/热备动车组/高速铁路线网/多目标优化/ε约束法

Key words

transportation planning and management/hot standby EMU/high-speed railway net-work/multi-objective optimization/ε-constraint method

分类

交通工程

引用本文复制引用

曲云腾,杨世瑞,杨军,赵东升,赵鹏..高速铁路线网热备动车组配置优化模型[J].北京交通大学学报,2025,49(4):1-8,8.

基金项目

国家自然科学基金(U2268207,52372299)National Natural Science Foundation of China(U2268207,52372299) (U2268207,52372299)

北京交通大学学报

OA北大核心

1673-0291

访问量0
|
下载量0
段落导航相关论文