基于可变编组的地铁列车延误运行调整研究

丁苗苗 王义惠 周奕成 季坤 谢存 孟令云

北京交通大学学报2025,Vol.49Issue(4):29-40,12.
北京交通大学学报2025,Vol.49Issue(4):29-40,12.DOI:10.11860/j.issn.1673-0291.20240124

基于可变编组的地铁列车延误运行调整研究

Research on adjustment of delayed metro train operations based on variable formation

丁苗苗 1王义惠 2周奕成 2季坤 2谢存 3孟令云4

作者信息

  • 1. 北京交通大学自动化与智能学院,北京 100044||陆军工程大学 军械士官学校,武汉 430075
  • 2. 北京交通大学自动化与智能学院,北京 100044
  • 3. 陆军工程大学 军械士官学校,武汉 430075
  • 4. 北京交通大学交通运输学院,北京 100044
  • 折叠

摘要

Abstract

To address the issue of train delays caused by uncontrollable factors during operation,this study investigates the impact of various adjustment strategies under a variable train formation operation mode on both passengers and subsequent train services.First,a train delay adjustment model is devel-oped based on the variable formation operation framework,incorporating constraints such as train for-mation,arrival and departure times,rolling stock circulation,headway intervals,and passenger flow calculations.Then,the model optimizes four key decision variables,train formation status,dwell time,section running time,and headway,to achieve two main objectives:minimizing the number of stranded passengers and minimizing the deviation between the actual and scheduled timetables.Fi-nally,using Shanghai Metro Line 16 as a case study,three distinct delay scenarios are simulated and solved using the CPLEX solver.The research results indicate that in different scenarios,for shorter de-lays,there is no need to implement coupling or decoupling strategies.However,for longer delays,these strategies are necessary to mitigate operational impacts.Within the same scenario,allowing cou-pling and decoupling operations significantly reduces both the impact on subsequent trains and the total number of stranded passengers compared to scenarios where such adjustments are not permitted.

关键词

城市轨道交通/可变编组运营模式/列车延误/列车运行调整

Key words

urban rail transit/variable formation operation mode/train delay/train operational adjustment

分类

交通工程

引用本文复制引用

丁苗苗,王义惠,周奕成,季坤,谢存,孟令云..基于可变编组的地铁列车延误运行调整研究[J].北京交通大学学报,2025,49(4):29-40,12.

基金项目

国家自然科学基金(72071016,U2368211) (72071016,U2368211)

北京市自然科学基金(25JL010)National Natural Science Foundation of China(72071016,U2368211) (25JL010)

Beijing Municipal Natural Science Foundation(25JL010) (25JL010)

北京交通大学学报

OA北大核心

1673-0291

访问量0
|
下载量0
段落导航相关论文