With the in-depth promotion of the strategy of"carbon peak and carbon neutrality",virtual power plant(VPP)has shown significant advantages in integrating and dispatching new energy.It is one of the effective means to improve the operation economy of VPP to deeply tap the huge potential of new energy in the field of reactive power support.Firstly,a set of new energy reactive power capacity evaluation system considering active power output and inverter constraints was constructed.Secondly,in order to improve the solving speed of the reactive power optimization model,according to the nonlinear characteristics of active network loss and power flow constraints,an active network loss estimation method based on power flow iteration and a power flow linearization method based on variable space optimization selection were proposed.A VPP linear power flow reactive power optimization model considering the reactive power potential of new energy sources and based on variable space optimization selection was constructed.Finally,the improved IEEE 33-node active distribution system was taken as an example to verify the effectiveness of the proposed model.The results show that when VPP makes full use of the reactive power support ability of new energy,the system voltage deviation is reduced by 0.673 pu,and the operating cost is reduced by 1 254.9 yuan.关键词
新能源/虚拟电厂/无功优化/线性潮流/网损估计Key words
new energy/virtual power plant/reactive power optimization/linear power flow/power loss estimation分类
能源科技引用本文复制引用
陶泽飞,刘敏,刘文霞..计及新能源无功潜力的虚拟电厂无功优化运行[J].分布式能源,2025,10(3):31-41,11.基金项目
中国南方电网有限责任公司重点科技项目(067600KK52222008)This work is supported by Key Scientific and Technological Project Funding of China Southern Power Grid Co.,Ltd.(067600KK52222008) (067600KK52222008)