| 注册
首页|期刊导航|红水河|大中型水利水电工程移民安置验收条件核查工作体系与必要性

大中型水利水电工程移民安置验收条件核查工作体系与必要性

彭铃铃 王磊

红水河2025,Vol.44Issue(3):32-35,41,5.
红水河2025,Vol.44Issue(3):32-35,41,5.DOI:10.3969/j.issn.1001-408X.2025.03.006

大中型水利水电工程移民安置验收条件核查工作体系与必要性

Work System and Necessity of Verification for Resettlement Acceptance Conditions in Large and Medium-Sized Water Conservancy and Hydropower Projects

彭铃铃 1王磊1

作者信息

  • 1. 广西壮族自治区水利电力勘测设计研究院有限责任公司,广西 南宁 530023
  • 折叠

摘要

Abstract

The resettlement acceptance verification for large and medium-sized water conservancy and hydropower projects constitutes a critical component of the engineering acceptance system.Through an in-depth study of verification procedures for resettlement acceptance conditions,the authors clarify that the essence of verification lies in conducting comprehensive inspection and evaluation of compliance with acceptance criteria prior to formal implementation.Its core objectives are to ensure regulatory conformity and operational effectiveness of the acceptance process.This paper systematically explores the necessity of verification:1)ensuring compliance with regulations and procedural solemnity;2)reducing resource waste and time costs;3)safeguarding migrants' rights and social stability;4)accelerating the resolution of legacy issues.A verification system is proposed,encompassing three fundamental principles,a complete operational workflow,and multi-dimensional verification methodologies.The research demonstrates that acceptance condition verification holds significant practical value in ensuring legal compliance and efficiency of acceptance procedures,safeguarding migrant' rights and social harmony,and expediting the resolution of outstanding problems.

关键词

大中型水利水电工程/移民安置/验收条件核查/工作体系

Key words

large and medium-sized water conservancy and hydropower projects/resettlement/acceptance condition verification/work system

分类

建筑与水利

引用本文复制引用

彭铃铃,王磊..大中型水利水电工程移民安置验收条件核查工作体系与必要性[J].红水河,2025,44(3):32-35,41,5.

红水河

1001-408X

访问量0
|
下载量0
段落导航相关论文