堆石混凝土坝施工缺陷分析及处理方案优化探讨

王之岑

红水河2025,Vol.44Issue(3):48-55,8.
红水河2025,Vol.44Issue(3):48-55,8.DOI:10.3969/j.issn.1001-408X.2025.03.009

堆石混凝土坝施工缺陷分析及处理方案优化探讨

Analysis of Construction Defects in Rock-Filled Concrete Dam and Optimization of Treatment Methods

王之岑1

作者信息

  • 1. 广西壮族自治区水利电力勘测设计研究院有限责任公司,广西 南宁 530023
  • 折叠

摘要

Abstract

To address construction defects in the rock-filled concrete of the Hejiang River Barrage,the author analyzes the causes of the defects and proposes treatment solutions through methods including water pressure tests in boreholes,borehole television inspection,and shear strength tests.The study reveals that surface contamination of the lift is the primary cause of poor interlayer bonding.For Dam Blocks No.4 and No.5,optimized measures involving"cement grouting of the existing dam body+dam body drainage+concrete patching on the upstream face"are adopted.For Dam Blocks No.7,No.8,and No.9,the treatment approach"cement grouting of the dam body+addition of an impervious face slab on the upstream side"is implemented.Stability stress recheck calculations confirm that the optimized anti-sliding stability safety factors reached 1.31-1.35,meeting the requirements of design specifications.This research provides valuable technical references for handling similar construction defects in rock-filled concrete dams,ensuring the stability and safety of the structure.

关键词

堆石混凝土/施工缺陷/层间结合不良/处理方案优化/坝体稳定

Key words

rock-filled concrete/construction defects/poor interlayer bonding/treatment solution optimization/dam stability