| 注册
首页|期刊导航|高速铁路(英文)|Passenger choice between demand-responsive train and pre-scheduled train in high-speed railway:A stated preference study

Passenger choice between demand-responsive train and pre-scheduled train in high-speed railway:A stated preference study

Tao Li Dewei Li Yongsheng Wang Han Gao Jialun Ma Haotian Ji

高速铁路(英文)2025,Vol.3Issue(2):125-136,12.
高速铁路(英文)2025,Vol.3Issue(2):125-136,12.DOI:10.1016/j.hspr.2025.04.002

Passenger choice between demand-responsive train and pre-scheduled train in high-speed railway:A stated preference study

Passenger choice between demand-responsive train and pre-scheduled train in high-speed railway:A stated preference study

Tao Li 1Dewei Li 1Yongsheng Wang 2Han Gao 3Jialun Ma 3Haotian Ji3

作者信息

  • 1. Department of Traffic and Transportation,Beijing Jiaotong University,Beijing 100044,China||Frontiers Science Center for Smart High-speed Railway System,Beijing Jiaotong University,Beijing 100044,China
  • 2. Wuhu Depot of China Railway Shanghai Group Co.,Ltd.,Shanghai 241005,China
  • 3. Department of Traffic and Transportation,Beijing Jiaotong University,Beijing 100044,China
  • 折叠

摘要

关键词

High-speed railway/Demand-responsive train/Stated preference/Mixed Logit model/Willingness to pay analysis

Key words

High-speed railway/Demand-responsive train/Stated preference/Mixed Logit model/Willingness to pay analysis

引用本文复制引用

Tao Li,Dewei Li,Yongsheng Wang,Han Gao,Jialun Ma,Haotian Ji..Passenger choice between demand-responsive train and pre-scheduled train in high-speed railway:A stated preference study[J].高速铁路(英文),2025,3(2):125-136,12.

基金项目

This research is supported by the National Natural Science Foundation of China(No.72471023,71971019),and the Fundamental Research Funds for the Central Universities(No.2024QYBS025). (No.72471023,71971019)

高速铁路(英文)

2949-8678

访问量0
|
下载量0
段落导航相关论文