电力勘测设计Issue(7):29-34,6.DOI:10.13500/j.dlkcsj.issn1671-9913.2025.07.004
江苏典型220kV分区电网供电能力提升方案研究
Research on Improving Power Supply Capacity in the Typical 220 kV District Grid in Jiangsu Province
孙顺祥 1李金科 1杨赟 1甄宏宁 1韩志锟1
作者信息
- 1. 中国能源建设集团江苏省电力设计院有限公司,江苏 南京 211102
- 折叠
摘要
Abstract
With the high-quality development of the economy in recent years,the demand for electricity in Jiangsu Province has been increasing year by year,which will put great pressure on the safety of power supply in some 220 kV regional power grids.In response to the problem of small power supply margin and insufficient power supply capacity in some typical 220 kV district power grids,the paper proposes to embed the technology such as phase shifting transformer and back-to-back DC transmission into 220 kV district power grid,which takes it as a means of mutual flow and on-demand control of the the main transformer load rate in higher-level 500 kV substation.This planning approach considers the full utilization of power grid existing resources as the basis and enhances the power supply capacity of district power grids through flow control,which can provide reference for the planning and development of large-scale 220 kV district power grids in other provinces and cities.关键词
分区电网/供电能力/移相器/背靠背直流Key words
district power grid/power supply capacity/phase shifting transformer/back-to-back DC transmission分类
信息技术与安全科学引用本文复制引用