基于非常规水源利用的某电厂气电替代工程水资源论证分析
Water Resources Argumentation of Gas-Electric Substitution Engineering of a Power Plant Based on Unconventional Water Resources Utilization
摘要
Abstract
In a power plant,two 460MW gas-steam combined cycle units were built in the way of"capacity replacement".The circulating cooling water of the unit uses the reclaimed water after treatment by the sewage treatment plant,and the chemical treatment water,fire water and domestic water are supplied by the water supply system of the first phase of the construction project.The research results show that the project water intake scheme is reasonable,the water intake source is reliable and the drainage scheme is feasible.The demonstration and analysis of the project is of great significance for improving the utilization of unconventional water resources and further optimizing the allocation system of water resources.关键词
非常规水/取水方案/取水水源/退水方案/水资源论证Key words
unconventional water resources/water intake scheme/source of water intake/drainage scheme/water resources argumentation分类
建筑与水利引用本文复制引用
张安琪,陈晖,黄锋华..基于非常规水源利用的某电厂气电替代工程水资源论证分析[J].广东水利水电,2025,(7):23-27,5.基金项目
广东省水利科技创新项目(编号:2021-01、2021-06). (编号:2021-01、2021-06)