河南水利与南水北调2025,Vol.54Issue(5):11-12,2.
塔岗水库防汛抢险道路修复方案及实施
Repair Plan and Implementation of Flood Control and Emergency Rescue Road for Tagang Reservoir
李秀成1
作者信息
- 1. 卫辉市沧河事务服务中心,河南 卫辉 453100
- 折叠
摘要
Abstract
Tagang Reservoir is a class Ⅲ medium-sized reservoir and the last one in the cascade development of Canghe River,the tributary of Weihe River in Haihe River Basin.The road for flood defence of Tagang Reservoir was damaged by the flood in July,2021,including subgrade landslide and pavement damage.In the paper the specific causes of subgrade damage are analyzed and different repair schemes and construction methods are proposed,with the aim of provide reference for design and construction of similar subgrade slope protection in the future.关键词
路基边坡/浆砌石贴坡护砌/干砌石护坡/浆砌石挡水坝Key words
subgrade slope/stone masonry for slope protection/dry stone pitching/stone masonry retaining dam分类
交通工程引用本文复制引用
李秀成..塔岗水库防汛抢险道路修复方案及实施[J].河南水利与南水北调,2025,54(5):11-12,2.