露天采矿技术2025,Vol.40Issue(4):8-13,6.DOI:10.13235/j.cnki.ltcm.20250144
车辆动载与地下水耦合作用下露天矿道路边坡变形控制技术
Deformation and control technology of open-pit mine transportation road slope under the coupling effect of vehicle dynamic load and groundwater
摘要
Abstract
In order to study the deformation and failure mechanism of open-pit mine road slopes under the coupling effect of vehicle dynamic loads and groundwater,and provide reasonable deformation control techniques,this article systematically analyzes the geological conditions,influencing factors,and stability of road slopes using geological surveys,physical mechanics experiments and numerical simulation method.The results show that vehicle dynamic loads and groundwater decrease the stability of road slopes by 0.153 and 0.094,respectively.Under the coupling effect of the two,the slope stability coefficient decreases to 1.058,a decrease of 0.218.The softening of weak rock layers in slopes when exposed to water and the cumulative deformation caused by periodic vehicle dynamic loads are the fundamental reasons for the deformation of road slopes.The article makes the comprehensive comparison among the foot pressing method,anchor reinforcement,lane load reduction scheme based on the working space conditions,construction period and control effect.The final recommendation is a lane load reduction scheme of 2 m,which can improve the slope safety factor to 1.197.关键词
露天矿/道路边坡/车辆动载/地下水渗流/变形控制Key words
open-pit mine/road slope/vehicle dynamic loading/groundwater seepage/deformation control分类
矿业与冶金引用本文复制引用
常华敏,赵梦令,韩流..车辆动载与地下水耦合作用下露天矿道路边坡变形控制技术[J].露天采矿技术,2025,40(4):8-13,6.基金项目
国家自然科学基金面上资助项目(52374144) (52374144)
辽宁省自然科学基金-国家重点实验室联合开放基金资助项目(2022-KF-23-10) (2022-KF-23-10)
新疆维吾尔自治区重大科技专项资助项目(2024A01003) (2024A01003)