水力发电2025,Vol.51Issue(8):1-5,10,6.
新时期我国抽水蓄能电站项目前期工作要点
Key Points for the Preparatory Work of Pumped-storage Power Station Project Development in China in the New Era
乔苏杰 1周建升 1刘一兵1
作者信息
- 1. 水电水利规划设计总院,北京 100120
- 折叠
摘要
Abstract
At present,the pumped-storage power station is a clean and flexible power supply,with the most mature technology,most suitable for large-scale development,superior economy and better matching effect with new energy sources such as wind power and photovoltaic power generation.Under the guidance of the"Carbon peak and carbon neutrality"goal,the pumped-storage power stations have now entered a new period of high-quality development.The preliminary work is crucial for the approval,commencement,construction and operation of the pumped-storage hydro station projects.On the basis of sorting out the development statue and existing problems of pumped-storage hydro station development in China,this paper analyzes the work content and key points of each stage in the preliminary work period,and puts forward suggestions for the preliminary work,which can provide reference for all stakeholders to carry out the preliminary work of pumped-storage hydro station projects with high quality.关键词
新时期/抽水蓄能项目/前期工作/预可行性研究/可行性研究/勘察设计Key words
new era/pumped-storage project/preliminary work/pre-feasibility study/feasibility study/investigation and design分类
建筑与水利引用本文复制引用
乔苏杰,周建升,刘一兵..新时期我国抽水蓄能电站项目前期工作要点[J].水力发电,2025,51(8):1-5,10,6.