铀矿冶2025,Vol.44Issue(3):35-40,6.DOI:10.13426/j.cnki.yky.2025.01.01
硬岩铀矿淋浸工艺参数优化
Optimization of Leaching Process Parameters of Hard Rock Uranium Ore
康佳红 1邓建国 1曹彪 1刘环 2师留印 3刘再道 1刘俊 1王应财 1马文涛1
作者信息
- 1. 中核韶关锦原铀业有限公司,广东韶关 511100
- 2. 中核广东矿业有限公司,广东韶关 511100
- 3. 核工业北京化工冶金研究院,北京 101149
- 折叠
摘要
Abstract
Due to the change in ore properties of a certain hard rock uranium mine with the increase of mining depth,the heap leaching process of the ore encountered the problem of heap scaling.In order to solve the problem,the effects of leaching agent acidity,spray intensity,column height and particle size on heap scaling were studied.The results show that when the acidity of the leaching agent is 50.0 g/L,the spray intensity is 40.0 L/(m2·h),and the leaching period is 30 days,there is no scal-ing in the column leaching test,and the uranium leaching rate of-10 mm ore reaches 83.40%.The results of the 800 t ore pilot test confirms that there is no scaling in the heap with high acidity and large spray intensity,and the uranium leaching rate reaches 86.57%.关键词
铀矿/堆浸/板结/浸出率/浸出剂/喷淋强度Key words
uranium mine/heap leaching/scaling/leaching rate/leaching agent/spray intensity分类
能源科技引用本文复制引用
康佳红,邓建国,曹彪,刘环,师留印,刘再道,刘俊,王应财,马文涛..硬岩铀矿淋浸工艺参数优化[J].铀矿冶,2025,44(3):35-40,6.