基于BIM技术的智能电厂施工进度控制模型设计

杨雁雁

智能城市2025,Vol.11Issue(6):155-157,3.
智能城市2025,Vol.11Issue(6):155-157,3.DOI:10.19301/j.cnki.zncs.2025.06.048

基于BIM技术的智能电厂施工进度控制模型设计

Design of construction schedule control model for intelligent power plant based on BIM technology

杨雁雁1

作者信息

  • 1. 安徽皖丰长能投资有限责任公司,安徽 合肥 231131
  • 折叠

摘要

Abstract

Taking the BH intelligent power plant construction project in a certain place as an example,the key points of the design of the construction progress control model of the intelligent power plant based on BIM technology are discussed.By analyzing the key value of BIM technology in construction progress control,the model design process is described,and its application effect is analyzed.The results show that BIM technology can significantly improve the efficiency of construction progress control,indicating that the rational application of BIM technology in the construction of intelligent power plants can optimize project management and ensure construction quality.

关键词

BIM技术/智能电厂/施工进度控制模型

Key words

BIM technology/intelligent power plant/construction progress control model