东北水利水电2025,Vol.43Issue(8):49-53,5.
黄家湾枢纽工程隧洞进口边坡变形破坏分析与治理方案
Analysis and treatment plan for deformation and failure of tunnel inlet slope of Huangjiawan Hub Project
金黎明1
作者信息
- 1. 贵州省水利投资(集团)有限责任公司,贵州 贵阳 550000
- 折叠
摘要
Abstract
During the construction of the No.1 tunnel in the lower dam field of Huangjiawan Hub,the slope at the inlet collapsed multiple times.To identify the cause of the slope collapse and formulate a reasonable treatment plan,through on-site investigation,borehole sampling and other methods,the geological conditions and rock and soil physical characteristics of the engineering area were clarified.The deformation characteristics and failure mechanism of the collapsed body were analyzed and determined.According to the engineering requirements,the excavation support and phased treatment plan were proposed.The stability calculation,analysis and comparison results of the collapsed body before and after the treatment show that the treatment plan is reasonable.This research can provide technical references for the treatment of collapsed bodies in similar engineering projects.关键词
边坡变形/垮塌体治理/隧洞边坡/黄家湾枢纽Key words
slope deformation/collapsed bodies treatment/tunnel inlet slope/Huangjiawan Hub分类
建筑与水利引用本文复制引用
金黎明..黄家湾枢纽工程隧洞进口边坡变形破坏分析与治理方案[J].东北水利水电,2025,43(8):49-53,5.