人民长江2025,Vol.56Issue(7):1-8,18,9.DOI:10.16232/j.cnki.1001-4179.2025.07.001
雅砻江流域梯级水库防洪库容分配多目标评价
Multi-objective evaluation on flood control capacity allocation of cascade reservoirs in Yalong River Basin
摘要
Abstract
Aiming at the difficulty in allocating flood control capacity of cascade reservoirs under complex hydraulic connec-tions,flood-prone area compositions,and multi-level flood control tasks in a basin,this study constructed a multi-objective e-valuation and analysis model for flood control capacity allocation of cascade reservoirs,to enhance flood control safety and security capabilities.Then a case study was conducted based on three cascade reservoirs in the Yalong River Basin.The results showed that:① Compared with the design schemes of the Lianghekou,Jinping-I,and Ertan cascade reservoirs,the optimal flood control capacity allocation scheme,given by the multi-objective evaluation and analysis model for cascade reservoirs' flood control ca-pacity allocation,can reduce the downstream flood peak flow,the maximum water level during the scheduling period,and the water level at the end of the flooding.②Flood magnitudes will affect the flood control capacity allocation of cascade reservoirs.Specific-ally,as flood magnitudes increase,the flood control capacity allocated to the Jinping-I Reservoir increases,while that allocated to the Ertan Reservoir decreases.The research findings can provide references for formulating flood control capacity operation meth-ods and joint operation schemes for cascade reservoirs.关键词
防洪库容分配/防洪调度/多目标评价/梯级水库/雅砻江流域Key words
flood control capacity allocation/flood control operation/multi-objective evaluation/cascade reservoirs/Yalong River Basin分类
建筑与水利引用本文复制引用
何彦锋,鲁圆圆,刘洁,周研来,陈华,郭生练..雅砻江流域梯级水库防洪库容分配多目标评价[J].人民长江,2025,56(7):1-8,18,9.基金项目
国家重点研发计划项目(2021YFC3200303) (2021YFC3200303)